Dog Training Lead Leash, 5m/32ft Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience (Black) Black

2024-05-05 04:17:11







Dog Training Lead Leash, 5m/32ft Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience (Black)

Product Features

  • Leash Size:5M/16Feet*2CM
  • Well made Training Leash:It's made of strong nylon with durable metal Buckle, the 29 cm D-ring cushioned handle is firm comfortable hold, works well if you want to tie if off or clip it to your waist, Suitable for trainers.
  • Swivel-style Stainless Steel Buckle:The dog lead comes with a Swivel-style Buckle for easy to attach to your dog s collar, rotated by 360 degree secure your pet to play in any way safely.
  • Long Lead: The 5meters/16Feet long dog lead is used for train the re-call of your dog, Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play or swimming.

Tags:pets_uk_update042022

Title - Default Title

如果有任何关于网站的意见,可以QQ联系或者发邮箱。

tags - tags - tags - tags - tags - tags - tags - tags - tags - tags - tags - tags - tags - tags - tags -