![](https://cdn.shopify.com/s/files/1/0269/1376/7486/products/B08J3MMBH1.jpg?v=1651152151)
![](https://cdn.shopify.com/s/files/1/0269/1376/7486/products/81X-3n9mwuL.jpg?v=1632409535)
![](https://cdn.shopify.com/s/files/1/0269/1376/7486/products/81or1KZwEdL.jpg?v=1632409535)
![](https://cdn.shopify.com/s/files/1/0269/1376/7486/products/71wImSTwtqL.jpg?v=1632409535)
![](https://cdn.shopify.com/s/files/1/0269/1376/7486/products/71XCNqf0DOL.jpg?v=1632409535)
![](https://cdn.shopify.com/s/files/1/0269/1376/7486/products/81_jDB5XKaL.jpg?v=1632409535)
![](https://cdn.shopify.com/s/files/1/0269/1376/7486/products/71iDGr2oi0L.jpg?v=1632409535)
VPbest Dog Training Lead 5m / 10m Dog Leads Training Leash - Dog Training Rope Lead Long for Pet Tracking Training - Long Lead Leash for Pet Recall Obedience (5m Black)
Colour Name:Black | Size Name:5m Features: 1.The 5 meters/16Feet long dog lead will be more convenient for you to train the re-call of your dog or just walk the dog in a field and without having to worry about it running away. 2.Be made of nylon and metal hook, our lead is very durable and sturdy. 3.Suitable for many pets. You can be washed with water, hung up and use again. Recycling and Easy to use. Specifications: Material: durable nylon and metal hook Length:5M/16FT Width: 2cm/0.8inch Color: Black Weight: 0.02kg Max Fit Weight: 60kg. package: 1 Strong Long Dog Lead Leash Note: When using the leash, hold the handle instead of holding the rope, otherwise your hand will be hurt by dog suddenly run. There is a needle attached the lead for fixing purpose, please be careful when remove it. Dogs that like chewing are may not suitable for this nylon rope.
Product Features
- STRONG AND DURABLE: The sturdy long dog head is made of strong nylon and durable metal hooks, more durable than cotton belts, easy to wear and remove
- LONG LEAD: The 5 meters/16Feet long dog lead will be more convenient for you to train the re-call of your dog or just walk the dog in a field and without having to worry about it running away
- CLOTHING SWITCH: Trigger hook for easy attachment to your dog's own collar, rotated by 360 degrees allows your pet to play more secure. Allows you to train your dog recalls and other obedience skills
- WIDELY USED: Our pet training rope is suitable for many pets like Samo,Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan mastiff and other pets. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming
- WORRY-FREE: If you have any questions about using the product or the product has any quality problems, please contact us in time. Best service for you
Tags:uk03
Colour Name - Black
Size Name - 5m