Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs
Who we are? NIMBLE is a brand found in 2009, which factory is personalized in manufacturing dog collars, leashes, harnesses and many other pet supplies.Our mission is to let all dog owners enjoy walking with your dogs! long leash for dog training long leash for dogs outside dog long leash long dog leash 30 feet extra long leash Long leash for dog training For small medium and large dogs Size Suggestion: 5FT | 10FT | 15FT: Perfect for daily walking, hiking, give your dog freedom while keeping within reach. 30FT | 50FT: Perfect for outdoor training,swimming and beach playing. Durable PVC material Waterproof and easy to clean 360° Rotation clasp to resist twisting Heavy-duty snap Easy-coil construction Read more PVC Material The dog lead is made of Flex poly coated nylon strap.It's smooth in texture, lightweight but strong . Comfortable Soft Handle With tight stitches, the handle is simple and comfortable 360 Rotate Clasp 360 degree tangle free swivel clasp and thick enhanced hardware gives your dogs best freedom and safety. Waterproof Dog Leash This dog rope leash can drag through the water and sand without getting wet and sand doesn’t really stick to it. Easy to Clean, it doesn't get all wet and stinky. Read more
Product Features
- Training leash:This waterproof training leash is great for teaching your dog recalls.Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming! Let our dogs more freedom!
- Waterproof :100% environmentally friendly PVC material made the waterproof dog leash and not as heavy as other nylon leash when wet .This material is also weatherproof and very easy to clean!
- Heavy Duty: The leash are soft, flexible, comfortable and smell-free.Strong tensile resistance can carry 600 lbs pull force and not easy to rip and can be used in all kinds of weather conditions. Give your dogs more comfortable and fresh!
- Multi color&size: We have many different colors and sizes to choose from. Pink / Blue / Orange / Black by width 3/5 inch with length 5FT /10FT /15FT /30FT/ 50FT.
- 100% MONEY BACK GUARANTEE - Feel free to contact us if you have any questions.No matter you and your dog not like this dog leash or size, no problem, get your money back or instead to a new one!
Tags:paw08
Color - Blue
Size - 5FT